Advancing Alberta oilfield brine projects toward potential battery-grade lithium production

Lithium Recovery in Pilot-Scale DLE Testing (not commercial scale)
~ 0 %
Acres of Mineral Licenses Held (July 2026)
0
Government Grant Funding Awarded, C$ Millions
CAD 0
Long-Term Company Debt
100

TSXV: LBNK | OTCQX: LBNKF | FRA: HT9

is an exploration- and development-stage lithium company with no current production, revenue or mineral reserves, focused on advancing its Boardwalk and Park Place lithium brine projects in Western Canada. At Boardwalk, the Company has signed a development agreement that includes binding DLE licensing terms with SLB and is advancing a modular development pathway supported by additional well ownership, bulk brine sampling, and ongoing process optimization. LithiumBank is working toward commercial lithium production through a phased approach designed to leverage existing infrastructure and reduce upfront capital intensity. There is no assurance that commercial production will be achieved. Doing so will require, among other things, completion of a feasibility study, permits and regulatory approvals, definitive agreements and substantial additional financing, which may dilute existing shareholders.

Outstanding Shares: 77,930,977

Warrants & Options: 13,300,000

Float: 56,604,238

Market Cap:C$29,613,771

Need To Know Dashboard

Development History

C$40 Million

Cumulative Company expenditures on exploration and project development since 2024, per the Company’s financial statements

1.24M Acres

Mineral licenses held across the Boardwalk and Park Place projects

Two NI 43-101 Mineral Resource Estimates

  • Boardwalk – 1.7 Mt LCE Measured @ 81.2 mg/L Li & 3.5 Mt LCE Indicated @ 81.8 mg/L Li & 2.8 Mt LCE Inferred at 79.0 mg/L Li (technical report effective February 20, 2025; 50 mg/L Li cut-off)
  • Park Place – 15.1 Mt LCE Inferred @ 80.0 mg/L Li (updated estimate announced May 29, 2025; inferred only) Boardwalk Preliminary Economic Assessment (PEA)†

34,005 Tonns

Average annual Lithium Hydroxide Monohydrate (LHM) production assumed in the PEA (as of July 2026) – a preliminary estimate, not a production forecast

† The PEA is preliminary in nature and includes inferred mineral resources that are considered too speculative geologically to have economic considerations applied to them that would enable them to be categorized as mineral reserves. There is no certainty that the PEA will be realized. The PEA estimated initial capital costs of US$[__], an after-tax NPV of US$[__] at a [__]% discount rate and an after-tax IRR of [__]% [insert from technical report]. The Company will require substantial financing to construct any project.

PAID ADVERTISEMENT

COMPENSATION DISCLOSURE: Emerging Markets Consulting, LLC (“EMC”) has been paid (US)$200,000 by wire transfer from LithiumBank Resources Corp. for a six month investor-awareness campaign running from Sept. 11, 2026 through  March 11, 2027 covering this page, the linked videos and related distribution. EMC has not received and will not receive any other compensation, including shares, options or warrants, from the Company or any third party in connection with this campaign. EMC does not know whether the Company’s officers, directors, other shareholders or purchasers in the Company’s August 2026 private placement will buy or sell shares during or after this campaign. EMC, its principals and affiliates do not own securities of LithiumBank Resources Corp. and will not buy or sell those securities at any time, including during and immediately after this campaign. EMC is not a registered broker-dealer or investment adviser. Nothing here is investment advice or a recommendation to buy or sell any security. Paid promotions can increase trading volume and share price temporarily, and share prices often decline after a promotion ends. Investors should conduct their own research, read the Company’s filings on SEDAR+ and consult a registered professional before investing.

† Mineral resources are not mineral reserves and do not have demonstrated economic viability. The preliminary economic assessment is inherently preliminary in nature. It includes inferred mineral resources that are too speculative geologically to have economic considerations applied to them that would enable them to be categorized as mineral reserves, and there is no certainty that the results indicated in this preliminary economic assessment will be realized. The technical report entitled “LithiumBank Resources Corp. Boardwalk NI 43-101 Technical Report” dated effective February 20, 2025 is available on SEDAR+.

Qualified Person: The scientific and technical information on this page is taken from the Company’s public disclosure and was reviewed and approved for that disclosure by [NAME, designation], a “qualified person” as defined in NI 43-101. EMC is not a qualified person and has not independently verified this information.

Cautionary Note to U.S. Investors: The mineral resource estimates referenced on this page were prepared in accordance with NI 43-101 and the CIM Definition Standards, which differ from the requirements of SEC Regulation S-K Subpart 1300. This information may not be comparable to similar information disclosed by U.S. companies subject to SEC reporting requirements.

Forward-Looking Information: This page contains forward-looking statements, including statements about planned demonstrations, permitting, engineering studies, definitive agreements, development, production and financing. These statements reflect current expectations and are subject to risks and uncertainties, including the scale-up of DLE technology, permitting, lithium price volatility, the availability and cost of financing and resulting dilution, and the ability to conclude definitive agreements. Actual results may differ materially. Readers should review the risk factors in the Company’s filings on SEDAR+. Neither EMC nor the Company undertakes to update these statements except as required by law.

How much confidence sits behind each number

Measured and indicated resources carry more geological confidence than inferred resources. The chart keeps the two apart and does not add them together.

Measured and indicated Inferred

Million tonnes of lithium carbonate equivalent (LCE). Inferred resources are considered too speculative geologically to have economic considerations applied that would enable them to be categorized as mineral reserves, and there is no certainty they will be upgraded. Mineral resources are not mineral reserves and do not have demonstrated economic viability.

A depleted oil field with decades of data beneath it

Boardwalk sits about 85 kilometres east of Grande Prairie, inside the South Sturgeon Lake oil field. The field was discovered in the 1950s, and hundreds of wells have produced there. The area has all-weather roads, existing well pads, pipelines and grid power. Most of this infrastructure is owned by third parties; see “Infrastructure option under discussion” below.

The Company’s plan is to reuse suitable infrastructure to lower upfront capital and shorten the path to production. That is a plan and not a result. It depends on definitive agreements, permits, engineering outcomes and financing.

The Company reports that the Leduc Formation at Boardwalk is more than 230 metres thick and is supported by decades of historical production data from more than 400 wells.

Land, Wells and Sites

  • Mineral tenure. The Company reports it has consolidated 100% of the brine-hosted mineral licenses over the Leduc and Beaverhill Lake Group/Swan Hills formations at Boardwalk, with no freehold mineral rights and no carbon sequestration or pore space permits or applications over the project.

  • Two wells, 100% owned. Transfer of the 1-12 well was completed in March 2026. The Company also owns the 10-6 well.

  • Brine in hand. 150 cubic metres of brine was collected from the 10-6 well for process optimization and downstream work.

  • Processing site option. In August 2026 the Company signed a binding option on up to 160 acres in the Sturgeon Lake area for a central processing facility, about 800 metres from Highway 43 and served by a 138 kV transmission line.

  • Infrastructure option under discussion. In July 2026 the Company signed a non-binding letter of intent for an option over existing wells, pipelines, surface leases and easements. It is not a definitive agreement.

Direct lithium extraction, with SLB as the DLE technology provider

DLE pulls lithium directly from produced brine, and the treated brine goes back into the reservoir. The Company says this design aims to reduce land use, water consumption and capital intensity compared with evaporation ponds. The five steps below follow SLB’s process as described in the Company’s July 2026 presentation.

LithiumBank logo on a teal panel beside a wooden boardwalk path across grassy plains toward a blue sky.

Subsurface and Well Field

Well-field optimization and asset management.

Impurity Removal

Hydrogen sulphide, hydrocarbons and solids are taken out before extraction.

Lithium Extraction

The DLE step selectively extracts lithium from the brine.

Polishing and Concentration

The lithium solution is polished and concentrated before conversion.

Conversion

Intended production of battery-grade lithium carbonate or lithium hydroxide.

Projects Spotlight: Boardwalk and Park Place

What LithiumBank holds at Boardwalk, asset by asset

Boardwalk is one project built from different kinds of assets, and they do not all carry the same certainty. Some are owned outright, some are options and some are letters of intent. Select an asset to see what it is, why it matters and what still has to happen.

Location About 85 km east of Grande Prairie, Alberta Setting South Sturgeon Lake oil field, discovered in the 1950s Formations Leduc (measured, indicated and inferred), plus Beaverhill Lake Group/Swan Hills (inferred only)
  • Owned, 100%
  • Binding option
  • Non-binding letter of intent
  • Resource estimate
  • Under study

Owned, 100%

10-6 well

A well the Company owns 100%. The Company reports that about 150,000 litres (150 cubic metres) of Boardwalk brine have been collected from it.

Why it matters

The brine supports process optimization and validation of the integrated flowsheet. The Company plans a well-to-product demonstration that builds on earlier SLB pilot testing, which reported lithium recoveries of up to 95% and overall impurity rejection above 99%. (Boardwalk - June 2026)

What is still ahead

The well-to-product demonstration is planned and has not been completed. Results to date come from pilot testing, and performance at commercial scale has not been demonstrated at Boardwalk.

Source: News release of September 11, 2026 and the Boardwalk project page.

Owned, 100%

1-12 well

The Company completed the transfer of this well in March 2026 and now holds 100% ownership.

Why it matters

The Company says the well, and data expected from an upcoming re-entry and completion program, are intended to support work under the SLB Development Agreement, including the feasibility study, front-end engineering design and project development planning. Re-entering existing wells for testing is part of the Company's strategy to reduce upfront capital.

What is still ahead

When the Company announced the transfer in March 2026, it described the re-entry and completion program as upcoming. Check later news releases for its status and results.

Source: Boardwalk project page.

Binding option

Central processing site

In August 2026 the Company signed a binding option to acquire up to 160 acres of privately owned land in the Sturgeon Lake area as a potential site for its planned central processing facility.

Where it sits

The site is about 800 metres from Highway 43 and is served by a 138 kV transmission line. An active natural gas pipeline crosses the southern part of the property. The Company has sited the proposed facility in the Municipal District of Greenview, about 15 kilometres south of Valleyview, Alberta.

Why it matters

The Company expects the broader project to include the processing facility, production and injection wells, and underground pipelines for produced and spent brine. Highway access and high-voltage power are practical needs for a plant of this kind.

What is still ahead

An option is a right to buy, not ownership. Exercising it, permitting the facility and completing engineering all remain ahead.

Source: News release of September 11, 2026 and the news release of September 21, 2026.

Non-binding letter of intent

Oilfield infrastructure

The project area has all-weather roads, existing well pads, pipelines and grid power, and a workforce with more than 70 years of hydrocarbon experience. In July 2026 the Company signed a non-binding letter of intent for an option to acquire existing wells, pipelines, related surface leases and easements associated with Boardwalk.

Why it matters

The Company expects the infrastructure could offer capital and timeline advantages by reducing the need to build new infrastructure, and it is evaluating the infrastructure for inclusion in the Feasibility Study.

What is still ahead

A non-binding letter of intent does not oblige either side to complete a transaction. Reuse of this infrastructure depends on a definitive agreement, engineering results and regulatory approvals.

Source: Boardwalk project page and the news release of September 11, 2026.

Resource estimate

Mineral resource estimate

The NI 43-101 estimate, effective February 20, 2025, reports 5.2 million tonnes of lithium carbonate equivalent (LCE) as measured and indicated in the Leduc Formation, at an average of 81.6 mg/L lithium. It also reports 2.8 million tonnes LCE as inferred in the Leduc Formation and the underlying Beaverhill Lake Group/Swan Hills Formation, at a weighted average of 79.0 mg/L.

Why it matters

The Company says the estimate is supported by decades of historical oil and gas production data and extensive well control, which it believes reduces geological uncertainty compared with many greenfield lithium projects. It reports that it has consolidated 100% of the brine-hosted mineral licenses over these formations at Boardwalk, with no freehold mineral rights and no carbon sequestration or pore space permits or applications over the project. The Company's July 2026 presentation puts the Leduc Formation at more than 230 metres thick in the project area.

What is still ahead

Mineral resources are not mineral reserves and do not have demonstrated economic viability. Inferred resources are considered too speculative geologically to have economic considerations applied that would enable them to be categorized as mineral reserves, and they are not added to the measured and indicated figure here.

Source: NI 43-101 technical report, the news release filing the report and the Boardwalk project page.

Under study

Feasibility and FEED area

SLB is conducting the Feasibility Study and front-end engineering design (FEED) for Boardwalk. The Company says the Feasibility Study is focused on the eastern portion of Boardwalk, a well-characterized brownfield area with extensive historical oil and gas infrastructure and data.

Why it matters

The Company says the study is evaluating the infrastructure covered by its July 2026 letter of intent. It runs alongside Stantec's environmental baseline surveys, which support the environmental application the Company needs in order to construct and operate Boardwalk.

What is still ahead

The Company is targeting mid to late 2027 for the study and FEED to conclude, and mid-2027 for submitting the environmental (EPEA) application. Targets can move, and the results are not yet known.

Source: News release of September 21, 2026 and the news release of September 11, 2026.

Company-reported information from LithiumBank’s news releases and project page, as of the dates shown. Mineral resources are not mineral reserves and do not have demonstrated economic viability. Resources are reported with a 50 mg/L lithium cut-off and converted to LCE with a factor of 5.323. Targets and plans are forward-looking, can change and are not assured. References to SLB describe a Company-disclosed agreement and do not mean SLB has reviewed or endorsed this page or the Company’s securities. This is paid promotion and not investment advice, and the full compensation disclosure appears at the top of this page and under “Paid Advertisement”. Investing in small-cap resource companies is speculative, and you could lose your entire investment.

Map of the Boardwalk NI 43-101 resource estimate outlining the Feasibility and FEED study area. Source: LithiumBank Resources Corp.

Company-reported information from LithiumBank’s news releases and project page, as of the dates shown. Mineral resources are not mineral reserves and do not have demonstrated economic viability. Resources are reported with a 50 mg/L lithium cut-off and converted to LCE with a factor of 5.323. Targets and plans are forward-looking, can change and are not assured. References to SLB describe a Company-disclosed agreement and do not mean SLB has reviewed or endorsed this page or the Company’s securities. This is paid promotion and not investment advice, and the paid promotion disclosure appears in the page footer. Investing in small-cap resource companies is speculative, and you could lose your entire investment.

Expansive dry grass prairie with rolling golden hills and a small cluster of green trees under a blue sky.

What LithiumBank holds at Park Place

Location West-central Alberta, between Edson, Fox Creek and Hinton, about 180 km west of Edmonton From Boardwalk About 50 km south Formations Leduc and Swan Hills (Devonian) Resource category Inferred only

The resource estimate was updated, and it is lower than the original

The Company reduced its Park Place license holdings, which it says lowers its annual licensing fees by C$821,468. The May 2025 update covers the licenses it now holds and reports less lithium carbonate equivalent (LCE) than the original estimate, so both figures are shown.

Million tonnes of inferred LCE. Both estimates are inferred, which is the category with the least geological confidence. The original estimate was 10.1 Mt in the Leduc Formation and 11.6 Mt in the Swan Hills Formation. The updated estimate is 8.7 Mt and 6.4 Mt, at an average of 80.0 mg/L lithium.
  • Owned, 100%
  • Inferred resource
  • Company-reported data
  • Pilot-scale testing
  • Longer-term asset

Owned, 100%

Mineral licenses

The Company describes Park Place as 100% owned. The consolidated project covers 538,360 acres of contiguous brine-hosted mineral licenses.

Why it matters

The Company's project page says the licenses are Crown mineral licenses with no freehold royalties and no carbon sequestration overlap. The Company says this simplifies development planning and reduces the potential for land-use conflicts.

What is still ahead

Holding licenses is not the same as having approvals to build or operate. Engineering, permitting and financing for any development remain ahead.

Source: Park Place project page and the news release of May 29, 2025.

Inferred resource

Leduc Formation

The updated estimate reports 8.7 million tonnes (8,659,000 tonnes) of inferred LCE in the Leduc Formation, at an average of 79.4 mg/L lithium.

Why it matters

The Leduc is one of the two Devonian-aged formations the project targets. The Company reports a maximum Leduc thickness of 366 metres within the claims area, and its project page says the formation is well understood through decades of historical oil and gas production and extensive subsurface data.

What is still ahead

Inferred resources are considered too speculative geologically to have economic considerations applied that would enable them to be categorized as mineral reserves. There is no certainty that any part will be upgraded to a higher category.

Source: News release of May 29, 2025 and the Park Place project page.

Inferred resource

Swan Hills Formation

The updated estimate reports 6.4 million tonnes (6,423,000 tonnes) of inferred LCE in the Swan Hills Formation, which underlies the Leduc, at an average of 80.9 mg/L lithium.

Why it matters

The Company maps the Swan Hills at 24 to 264 metres thick within the claims area and says the two formations appear to be in hydraulic communication, based on regionally available pressure data. The project-wide average of 80.0 mg/L is weighted by pore volume across both formations.

What is still ahead

Hydraulic communication is an interpretation based on regional data. The Swan Hills figure is inferred, like the Leduc figure, and carries the same limits on confidence.

Source: News release of May 29, 2025 and the Park Place project page.

Company-reported data

Subsurface data

The Company's project page says reservoir continuity is supported by more than 450 historical wells, 2D and 3D seismic coverage and multiple lithium-brine analyses across the project area.

Why it matters

The Company points to this dataset as the basis for its view that the Leduc and Swan Hills formations are well understood.

What is still ahead

Historical wells reflect past oil and gas activity, and the resource remains inferred.

Source: Park Place project page. These figures come from the Company's page and were not independently confirmed.

Pilot-scale testing

DLE pilot testing

Pilot testing with SLB on bulk brine samples from Boardwalk and Park Place reported lithium recovery of up to 95% and impurity rejection above 99% for both brines. At steady state, the Park Place brine reached 95% recovery. The Company announced the results on April 14, 2025.

Why it matters

The Company believes the results support the potential suitability of the project's brine chemistry for modern direct lithium extraction (DLE) technologies.

What is still ahead

These are pilot-scale results and do not show commercial-scale performance. The Development Agreement with SLB, and the Feasibility Study and FEED it is conducting, are for Boardwalk.

Source: News release of April 14, 2025 and the news release of September 21, 2026.

Longer-term asset

Role in the portfolio

The Company says it is advancing Boardwalk toward commercial production and describes Park Place as a longer-term development asset that could add scale later.

Why it matters

The SLB Feasibility Study and front-end engineering design are focused on Boardwalk. Park Place currently has an inferred resource estimate and no development timeline on the Company's project page.

What is still ahead

Any development at Park Place would need further technical work, permitting and financing. Progress at Boardwalk does not by itself change the status of Park Place.

Source: Park Place project page and the news release of September 21, 2026.

The Company reports that pilot-scale DLE testing conducted with SLB on Park Place brine (June 2026) achieved approximately 95% lithium recovery and greater than 99% impurity rejection. Pilot-scale results may not be representative of commercial-scale performance. The Company believes these results indicate that the project’s brine chemistry may be amenable to DLE processing. The Company has not produced battery-grade lithium products at commercial scale, and comparisons of environmental footprint with conventional evaporation methods have not been independently verified.

Featured Videos

Meet LithiumBank Leadership Team

Paul Matysek
Executive Chairman
Portrait of a middle-aged man with gray hair wearing a blue patterned blazer and light blue shirt, against a light gray background.
Rob Shewchuk
Co-founder, CEO & Director
Professional head-and-shoulders portrait of a man in a navy blazer and light blue shirt, smiling against a light gray background.
Katya Zotova
Director
Professional portrait of a woman with blonde hair wearing a dark blazer, looking at the camera.
Christopher Murray
Director
Professional headshot: smiling man in a dark suit and yellow tie with glasses.
Steven Piepgrass
Director
Professional headshot of a man with dark hair and beard, wearing glasses and a navy blazer against a light background.
Ann Fehr
CFO & Corporate Secretary
Professional headshot of a woman with gray hair, glasses, wearing a dark blazer and pearl necklace.
Kevin Piepgrass, P.Geo
Chief Operating Officer
Professional headshot of a man in a navy blazer and light blue shirt, smiling at the camera.
Logan Harris
VP Project Development
Professional headshot of a man with dark hair and a beard, wearing glasses and a light blazer against a gray backdrop.
Jon LaMothe, M.Sc
VP Exploration
Man wearing glasses in a blue puffer jacket, smiling outdoors with a snowy landscape in the background.
Nikolas Matysek
Director of Communications
Professional headshot of a smiling man in a dark suit and white shirt against a gray background, suitable for business profiles
Must Read OTC Markets/SEC policy on stock promotion and investor protection